Applying the Analytic Hierarchy Process (AHP) to the Optimization of Contractors and Construction Material Selectors: Integrating International Trade and Industrial Applications

Authors

  • Vahid Taher Khani 1. Bachelor of Professional Engineering in Industrial Safety (HSE) and Master of Industrial Engineering in Engineering Management from Isfahan University of Technology
  • Mohammad Javad Arabnejad 2. Bachelor of industrial engineering and Master of industrial engineering in Engineering Management from Isfahan University of Technology
  • Faezeh Lorestani 3. Bachelor of applied Chemistry and Master of medical biochemistry and industrial engineering in Engineering Management from Isfahan University of Technology
  • Masoomeh Zarei 4. Bachelor of Economics and Master of Industrial Engineering in Engineering Management from Isfahan University of Technology
  • Mohammad Shafieian 5. Bachelor of Mechanical Engineering and Master of Industrial Engineering in Engineering Management from Isfahan University of Technology
  • Meysam Sharifi 6. Bachelor of industrial engineering and Master of industrial engineering in Engineering Management from Isfahan University of Technology

DOI:

https://doi.org/10.63053/ijset.135

Keywords:

Analytic Hierarchy Process, Contractor Selection, Construction Material Supplier, Multi-Criteria Decision Making, Construction Projects

Abstract

In the construction industry, the optimal selection of contractors and suppliers of building materials plays a decisive role in the quality, cost, and time of project implementation. Decision-making in this area is usually accompanied by considering multiple indicators such as price, quality, reliability, work experience, and technical ability. The present study examines and integrates the application of the Analytic Hierarchy Process (AHP) method as one of the powerful tools of multi-criteria decision-making in the process of selecting contractors and suppliers of building materials. By reviewing two international case studies in Taiwan and Indonesia and analyzing the approaches used in them, the strengths and weaknesses of the performance of this method in practical and industrial conditions have been evaluated. The results show that the use of the AHP model increases transparency, reduces the risk of inappropriate selection, and improves project quality control. This method also allows the integration of quantitative and subjective data and, by prioritizing indicators, makes project managers' decision-making more logical and systematic. Finally, suggestions are presented for more effective implementation of AHP in construction projects and development of indigenous models based on the conditions of the construction industry.

 

 

References

Selection of Suppliers of Building Materials Using the Analytical Hierarchy Process (AHP) Method at PT. Cipta Nuansa Prima Tangerang

APPLYING THE AHP TO SUPPORT THE BEST-VALUE CONTRACTOR SELECTION – LESSONS LEARNED FROM TWO CASE STUDIES IN TAIWAN

Published

2026-02-02

How to Cite

Taher Khani, V., Arabnejad, M. J., Lorestani, F., Zarei, M., Shafieian, M., & Sharifi , M. (2026). Applying the Analytic Hierarchy Process (AHP) to the Optimization of Contractors and Construction Material Selectors: Integrating International Trade and Industrial Applications. International Journal of Modern Achievement in Science, Engineering and Technology, 3(1), 1–9. https://doi.org/10.63053/ijset.135

Issue

Section

Articles

Most read articles by the same author(s)